Notes:
7/28/2025 8:48:17 AM
7/29/2025 3:08:28 PM
Main Level: kitchen and bath remodel using existing layouts. Add can lighting throughout. Add 2 bedroom and 1 bath.
Upper level: remodel all bathrooms. Add can lighting throughout. Add smoke and co detectors. Update entry to bedroom 2 to make ensuite bath.
Lower Level: remodel bath using existing layout. Add can lighting throughout.