Heading | 01/03/2023 | PRE CONSTRUCTION | Fabian Ruiz | APPROVED | 9am | 1/3/2023 12:03:16 PM
Pre construction meeting has been completed and development is ready for construction.
|
|
Heading | 03/31/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Type 13 inlets (2) | 3/30/2023 2:29:07 PM
3/30/2023 2:29 PM BVB GENERAL CONTRACTORS - ROW
Storm inlets rebar
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 9705159866
e-Mail: [email protected]
3/31/2023 4:35:50 PM
Two type 13 inlets were formed and poured. All work was done per COA standards
|
|
Heading | 04/03/2023 | ROW TRAFFIC** | Zach Peachey | APPROVED | TC MHT | 4/4/2023 7:51:30 AM
Contractors road closure was per MHT plan.
|
|
Heading | 04/04/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | 10" hit | 4/3/2023 2:58:19 PM
4/3/2023 2:58 PM BVB GENERAL CONTRACTORS - ROW
digging to expose water line
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 9705159866
e-Mail: [email protected]
4/5/2023 7:37:07 AM
Contractor hit an unmarked water service line. Water department came out to shut down the water, a 10" repair clamp was used for temporary fix. All work was done per COA standards.
|
|
Heading | 04/05/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Tapping | 4/3/2023 1:08:50 PM
4/3/2023 1:08 PM BVB GENERAL CONTRACTORS - ROW
cut in T''s, water tap
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 9705159866
e-Mail: [email protected]
4/5/2023 5:15:38 PM
Contractor took out 18LF of 10" AC main and replaced it with 18LF of 10" PVC main.
Fireline 6" T was installed on main
1.5 domestic water line was saddle tapped
3/4" irrigation was saddle tapped
Contractor upsized 8" main gate valve with 10" because the main is a 10". Hydrant valve was also installed. All work was done per COA standards.
|
|
Heading | 04/07/2023 | DEV WET UTILITY | Robert Gonzales | APPROVED W/COND | FL/IRR/DL | 4/5/2023 5:15:44 PM
4/5/2023 5:15 PM BVB GENERAL CONTRACTORS - ROW
run fire and irrigation lines
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 9705159866
e-Mail: [email protected]
4/7/2023 7:34:10 AM
Contractor stubbed FL/IRR/SL into property, flash filled W 69th Ave Irrigation vault interior plumbing needs to done and Service line meter pit needs to be complete, FL needs to be stubbed into building
|
|
Heading | 04/07/2023 | UNDERGRND DETENTION/WATER QUALITY | Mark Thomas | CANCELLED | eTRAKiT Inspection Request | 4/6/2023 3:06:08 PM
4/6/2023 3:06 PM BVB GENERAL CONTRACTORS - ROW
inlet rebar
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 9705159866
e-Mail: [email protected]
|
|
Heading | 04/10/2023 | DEV WET UTILITY | Robert Gonzales | APPROVED | Fire Hydrant Install | 4/10/2023 7:13:07 AM
Contractor installed Fire Hydrant per COA standards.
|
|
Heading | 04/10/2023 | ROW ASPHALT** | Robert Gonzales | APPROVED | Asphalt Patches | 4/10/2023 7:11:26 AM
A fast Patch completed (2) utility trench patches per COA Standards.
|
|
Heading | 04/12/2023 | DEV WET UTILITY | Zach Peachey | CANCELLED | Stop work notice | 4/11/2023 8:50:56 AM
4/11/2023 8:50 AM BVB GENERAL CONTRACTORS - ROW
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/13/2023 7:48:42 AM
No work was done due to the stop work notice.
|
|
Heading | 04/18/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Storm HDPE install | 4/17/2023 11:24:27 AM
4/17/2023 11:24 AM BVB GENERAL CONTRACTORS - ROW
storm pipe
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3039131930
e-Mail: [email protected]
4/19/2023 7:48:47 AM
Contractor started installing 12" HDPE storm. All work was done per COA standards.
|
|
Heading | 04/19/2023 | DEV WET UTILITY | Zach Peachey | CANCELLED | No flush | 4/18/2023 3:29:17 PM
4/18/2023 3:29 PM BVB GENERAL CONTRACTORS - ROW
Flush and Pressure test of Fire Hydrant
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/19/2023 11:16:53 AM
No flush will be done.
|
|
Heading | 04/19/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Sanitary service | 4/18/2023 11:03:13 AM
4/18/2023 11:03 AM BVB GENERAL CONTRACTORS - ROW
Sanitary Sewer Install
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/19/2023 4:22:43 PM
Contractor completed the sewer service line up to 5FT outside the foundation. All work was done per COA standards.
|
|
Heading | 04/20/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Fireline install | 4/11/2023 12:10:13 PM
4/11/2023 12:10 PM BVB GENERAL CONTRACTORS - ROW
Hydrostatic test Fire hydrant
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/19/2023 2:56:32 PM
4/19/2023 2:56 PM BVB GENERAL CONTRACTORS - ROW
waterline install
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/21/2023 7:36:05 AM
Contractor began installing fireline into the DEV. All work was done per COA standards.
|
|
Heading | 04/21/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Fire line | 4/20/2023 1:56:24 PM
4/20/2023 1:56 PM BVB GENERAL CONTRACTORS - ROW
Water line install
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/21/2023 5:02:57 PM
Contractor installed fire line into foundation. All work was done per COA standards.
|
|
Heading | 04/24/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Fire line fill | 4/21/2023 1:43:43 PM
4/21/2023 1:43 PM BVB GENERAL CONTRACTORS - ROW
Fill 6" Fire Line 9:00 A.M.
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/25/2023 7:55:21 AM
COA water department filled the fire line for it to stay filled for 24hrs.
All work was done per COA standards.
|
|
Heading | 04/24/2023 | DEV WET UTILITY | Zach Peachey | DENIED | Pressure test | 4/21/2023 1:50:11 PM
4/21/2023 1:50 PM BVB GENERAL CONTRACTORS - ROW
Bac T test 9:00 am
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/25/2023 7:56:15 AM
Contractor failed fire hydrant pressure test due to loss in PSI.
|
|
Heading | 04/27/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Fire Line test | 4/21/2023 1:47:33 PM
4/21/2023 1:47 PM BVB GENERAL CONTRACTORS - ROW
flush 6" line 9:00 am and hydrostatic test 12:00
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/28/2023 8:07:10 AM
Contractor passed their fire line pressure test. Flushing happened after by our Water Department.
All work was done per COA standards.
|
|
Heading | 04/28/2023 | DEV WET UTILITY | Zach Peachey | CANCELLED | Cancelled | 4/27/2023 1:24:58 PM
4/27/2023 1:24 PM BVB GENERAL CONTRACTORS - ROW
Super flush of 6" fire line, Scheduled with Arvada Fire for 11:00 AM
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
4/28/2023 8:15:52 AM
Cancelled due to having a schedule miscommunication with Arvada Fire.
|
|
Heading | 04/28/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Inlets | 4/27/2023 11:18:48 AM
4/27/2023 11:18 AM BVB GENERAL CONTRACTORS - ROW
Storm pipe and inlet construction
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
5/1/2023 8:13:40 AM
Contractor completed fire hydrant pressure test.
Contractor also poured two inlets.
|
|
Heading | 05/02/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | HDPE install | 5/1/2023 4:26:46 PM
5/1/2023 4:26 PM BVB GENERAL CONTRACTORS - ROW
Storm pipe at outlet
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
5/3/2023 8:08:32 AM
Contractor installed 10 LF of 12" HDPE. All work was done per COA standards.
|
|
Heading | 05/04/2023 | DEV WET UTILITY | Zach Peachey | APPROVED | Super flush | 4/28/2023 2:37:33 PM
4/28/2023 2:37 PM BVB GENERAL CONTRACTORS - ROW
flush/ Super flush wit F.D at11:00
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
5/4/2023 4:59:06 PM
Contractor did a super flush with AFD and passed.
|
|
Heading | 06/09/2023 | DEV CONCRETE | Zach Peachey | DENIED | Bad subgrade | 6/8/2023 12:55:27 PM
6/8/2023 12:55 PM BVB GENERAL CONTRACTORS - ROW
Pouring crosspan at 3:00 pm
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3039131930
e-Mail: [email protected]
6/12/2023 8:46:55 AM
Contractor installed a new sewer service line. All work was done per COA standards.
Contractor installed a new Water service line using a compression fitting. All work was done per COA standards.
6/12/2023 9:02:43 AM
Disregard above inspection. Contractor was not ready for concrete cross pan. Subgrade was not proper to place concrete on.
|
|
Heading | 06/23/2023 | DEV CONCRETE | Robert Gonzales | APPROVED | No Work/weather | 6/21/2023 11:57:03 AM
6/21/2023 11:57 AM BVB GENERAL CONTRACTORS - ROW
Sub grade inspection for entry cross pan
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3039131930
e-Mail: [email protected]
6/23/2023 7:00:52 AM
Contractor cancelled compaction testing due to weather.
|
|
Heading | 06/26/2023 | DEV CONCRETE | Zach Peachey | APPROVED | Subgrade/prep | 6/23/2023 9:05:17 AM
6/23/2023 9:05 AM BVB GENERAL CONTRACTORS - ROW
sub grade inspection for crosspan
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3039131930
e-Mail: [email protected]
6/27/2023 8:26:02 AM
Contractor subgrade was per COA standards.
|
|
Heading | 06/27/2023 | DEV CONCRETE | Zach Peachey | APPROVED | Concrete | 6/26/2023 2:11:54 PM
6/26/2023 2:11 PM BVB GENERAL CONTRACTORS - ROW
9:00 am concrete pour
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
6/28/2023 7:48:59 AM
Contractor completed concrete. I will create another inspection once I have measured the ADA ramps.
|
|
Heading | 11/06/2023 | DEV CONCRETE | Zach Peachey | APPROVED | Subgrade test | 11/3/2023 2:50:20 PM
11/3/2023 2:50 PM BVB GENERAL CONTRACTORS - ROW
Subgrade testing for sidewalk
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
11/7/2023 7:06:58 AM
Concrete subgrade was per COA standards. Passed heal and probe test and compaction testing.
|
|
Heading | 11/07/2023 | DEV CONCRETE | Zach Peachey | APPROVED | 16yrds sidewalk | 11/6/2023 3:07:57 PM
11/6/2023 3:07 PM BVB GENERAL CONTRACTORS - ROW
Sidewalk
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
11/8/2023 7:49:01 AM
Contractor installed 16yards of concrete sidewalk. All work was done per COA standards.
|
|
Heading | 12/18/2023 | DEV ASPHALT | Zach Peachey | APPROVED | 24" cut back | 12/14/2023 8:48:25 AM
12/14/2023 8:48 AM BVB GENERAL CONTRACTORS - ROW
remove and replace 2'' asphalt at entry, 10:00 am 1st lift
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3036370981
e-Mail: [email protected]
12/19/2023 7:11:34 AM
Contractor did 3 lifts on the 24" cut back at the entrance. All work was done per COA standards.
|
|
Heading | 11/14/2024 | DEV CONCRETE | Zach Peachey | APPROVED | Demo | 11/13/2024 1:05:59 PM
11/13/2024 1:05 PM BVB GENERAL CONTRACTORS - ROW
Demo spalling concrete, regrade
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3039126516
e-Mail: [email protected]
11/14/2024 3:41:48 PM
Contractor demoed the concrete cross pan near entrance.
|
|
Heading | 11/15/2024 | DEV CONCRETE | Zach Peachey | APPROVED | Punch list concrete | 11/13/2024 3:26:40 PM
11/13/2024 3:26 PM BVB GENERAL CONTRACTORS - ROW
10:00 A.M. Concrete , subgrade
Contact Name: BVB GENERAL CONTRACTORS - ROW
Site Address: 14812 W 69TH AVE
Phone: 3039126516
e-Mail: [email protected]
11/15/2024 4:09:17 PM
Contractor completed their punch list item.
Concrete cross pan was poured. 4500psi mix, fiber mesh, #4 rebar with epoxy, subgrade passed heel and probe test. All work was done per plan.
Ambient temp - 50 degrees.
Concrete Blanket - Yes
TC - Yes
|
|
Heading | 01/16/2025 | DEV WET UTILITY | Zach Peachey | APPROVED | TW check | 1/16/2025 7:44:03 AM
Tracer Wire check.
1/16/2025 4:39:17 PM
Water department went on site to verify TW works from box. TW does in fact work.
|
|
Heading | 08/11/2025 | INITIAL WARRANTY | Scott Gallardo | APPROVED | Clean up | 8/11/2025 9:47:20 AM
Initial warranty accepted.
|
|