Permit Number:  ROW24-00849
Permit Address:  15583 W 65TH AVE
Permit Type: DRY UTILITY
Permit Subtype: COMMUNICATIONS
Job Value: $5,000.00
Description: Bore, place conduit, pull cable and splice -JB#1290818
Status: ISSUED
Applied Date: 6/24/2024
Approved Date: 7/30/2024
Issued Date: 8/2/2024
Permit Contacts
APPLICANT:
TAK BROADBAND, LLC dba TAK COMMUNICATIONS
CITY INSPECTOR:
ZACH PEACHEY
CONTRACTOR:
TAK BROADBAND, LLC dba TAK COMMUNICATIONS
ONSITE SUPERVISOR:
Rapid Wire
UTILITY CO:
Comcast
Fee Summary

Fee Description Fee Amount Amount Paid
use tax $100.34 $100.34
asphalt patch - sy $65.00 $65.00
bore pit - ea $513.00 $513.00
boring - lf $1,350.00 $1,350.00
combination c, g, & w - lf $65.00 $65.00
street degredation fee - lf $560.00 $560.00
street subgrade - sy $65.00 $65.00
test hole - concrete - ea $975.00 $975.00
test hole - landscape - ea $1,178.00 $1,178.00
test hole - street - ea $520.00 $520.00
traffic control plan review $315.00 $315.00
undergrnd utility-private - lf $1,350.00 $1,350.00

Total $7,056.34 $7,056.34

Additional Information

START DATE OF WORK : Jul 31 2024 12:00AM
LOCATE NUMBER : None
ARVADA BUSINESS LIC : ACE8191
EMERGENCY REPAIR : NO
END DATE OF WORK : Oct 31 2024 12:00AM
TAX EXEMPT : NO
UTILITY PROJECT NO : JB#1290818

Permit Information

PERMIT IS NOT VALID UNTIL FEES HAVE BEEN PAID

  1. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced.
  2. This permit, approved plan sets, and other required documents for this project shall be printed and kept on site until the completion of the project.
  3. Call Before You dig, Call 811 3 working days before the project starts for locations of all utility lines.
  4. Backflow assembly tests must be sent to [email protected].

The issuance of this permit, any inspections made, or certificates of occupancy issue shall not be construed to be a permit for, nor an approval of any violation of Building Codes, Engineering Standards and Specifications, or any other code or ordinance adopted by the City of Arvada. Failure to comply with these laws or correct deficient work shall lead to an immediate revocation of the permit. Per sections 69.0 and 78-309 of the Arvada Municipal Code, the permittee shall be responsible for and bear the sole cost of any required relocation of their facilities located in or adjacent to public rights-of-way whether above or below ground. By accepting this permit, the permittee acknowledges this requirement.

Information you submit to the City of Arvada may be subject to the Colorado Open Public Records Act ("CORA"), C.R.S. ยง24-72-201 et seq. Information you submit via the City's application system will be viewable by the public. As such, do not upload any Personal Identifying Information such as driver's licenses, passports, social security numbers, credit card information, bank account information or dates of birth. The City of Arvada, its officers, employees or agents shall not be liable for damages or losses of any kind arising out of or in connection with the use or performance of information, including but not limited to, damages or losses caused by reliance upon the accuracy or timeliness of any such information, or damages incurred from the viewing, distributing, or copying of those materials.

Utility Locates

All utilities must be identified through the locate process prior to excavation of soil, including boring, can take place. In the event, that a City Utility cannot be located within the specified boundaries of the request area, the contractor/excavator will be notified by e-mail and/or phone of a mandatory on-site meeting to discuss alternate measures for protecting the utility. No excavation of soil, including boring, is permitted until the on-site meet has taken place and all utilities have been located. Failure to comply will be deemed unreasonable action by the contractor/excavator and may result in the contractor/excavator assuming all liability for damages to such utilities

Color   Description
Red Electric power lines, cables, conduit, and lighting cables
Orange Telecommunication, alarm or signal lines, cables, or conduit
Yellow Natural gas, oil, steam, petroleum, or other gaseous, or flammable material
Green Sewers and drain lines
Blue Drinking water
Purple Reclaimed water, irrigation, and slurry lines
Pink Temporary survey markings, unknown/unidentified facilities
White Proposed excavation limits or route
Approved By: MMA
Approved Date: 7/30/2024