Notes:
12/10/2020 1:52:55 PM
Just waiting on contractor sign on forms and TCP.
12/22/2020 5:10:15 PM
Per Keith no TCP needed for this permit.
8/24/2021 10:53:52 AM
Need concrete mix design
1/25/2022 9:05:52 AM
Per Jim Greer - concrete mix design was approved in the field. Testing was completed so not needed at this time.