Notes:
2/9/2026 10:00:01 AM
Furnish and install new "Bypass Type" utility meter housing Furnish and install new 200 amp, 120/240 volt main breaker load center with up to 40 circuit capacity Install conduit slip sleeve at conduit feeding the utility meter. This slip sleeve allows for ground movement without damaging the new electrical load center Terminate all grounding and neutral conductors Furnish and install all new circuit breakers, terminate branch circuit conductors to the new circuit breakers Install appropriate arc fault, protection Furnish and install new standard whole home surge protector Install new grounding electrode system sized at 200 amps. This includes the cold water bond, 8' copper coated steel ground rod driven flush with grade, and an inter-system bonding jumper Energize system and test home for correct operation Includes the installation of wire to extend an existing circuit to power a specific device within the home. This service covers 1-5 feet of wire, the first electrical box, and the first device in the circuit. This task is for open access work. If anything needs to be done to gain access, additional charges will apply