| Detailed scope of work | Delete existing shower, tub and tub deck, move non load bearing dividing wall between tub and shower to finish 58" from west wall, new shower location on west side of bathroom, new free standing tub location on east side of bathroom, delete pedestal from water closet and cap off plumbing, new vanity in existing location, new tile shower base, new shower valve and shower diverter, new free standing tub, new wall mounted tub filler, 2 new sinks/faucets, 2 new vanity lights in existing locations, no mechanical work needed |
| TOTAL REMODEL SQ | 108 |
| BATHROOM REMODEL | 1 |
| KITCHEN REMODEL | |
| BASEMENT FINISH | |
| FOUNDATION REPAIR | |
| ELECTRICAL WORK COMPLETED | NO ELECTRICAL WORK COMPLETED |
| PLUMBING WORK COMPLETED | COMPLETED BY CONTRACTOR |
| MECHANICAL WORK COMPLETED | NO MECHANICAL WORK COMPLETED |
| CODE YEAR | 2018 |
| TAX EXEMPT | NO |
| Inspected for Asbestos | AN ASBESTOS INSPECTION HAS BEEN / WAS CONDUCTED ON THE BUILDING MATERIALS THAT WILL BE DISTURBED BY THIS PROJECT. CLEARANCE REPORT MUST BE ONSITE. |