Detailed scope of work | We will be remodeling the master bathroom tub to shower conversion and valve swap, the hall bathroom tub to shower conversion with a valve swap. We will be demoing more than 32 sqft, there are two negative asbestos tests |
TOTAL REMODEL SQ | 25 |
BATHROOM REMODEL | 1 |
KITCHEN REMODEL | |
BASEMENT FINISH | |
FOUNDATION REPAIR | |
ELECTRICAL WORK COMPLETED | NO ELECTRICAL WORK COMPLETED |
PLUMBING WORK COMPLETED | COMPLETED BY CONTRACTOR |
MECHANICAL WORK COMPLETED | NO MECHANICAL WORK COMPLETED |
CODE YEAR | 2018 |
TAX EXEMPT | NO |
Inspected for Asbestos | AN ASBESTOS INSPECTION HAS BEEN / WAS CONDUCTED ON THE BUILDING MATERIALS THAT WILL BE DISTURBED BY THIS PROJECT. CLEARANCE REPORT MUST BE ONSITE. |