|
Attachments: |
Revised E Plans_City RFI 2_COMM23-00099 | Revised E Plans_City RFI 2_COMM23-00099.pdf | |
Deferred Submittal_Roof Trusses Area C-D Rev.2_COMM23-00099 | Deferred Submittal_Roof Trusses Area C-D Rev.2_COMM23-00099.pdf | |
Deferred Submittal_Structrual Steel Area D Leave Out Rev.1_COMM23-00099 | Deferred Submittal_Structrual Steel Area D Leave Out Rev.1_COMM23-00099.pdf | |
Deferred Submittal_Floor Truss Design 2nd, 3rd, 4th Area C-D Rev.2_COMM23-00099 | Deferred Submittal_Floor Truss Design 2nd, 3rd, 4th Area C-D Rev.2_COMM23-00099.pdf | |
REVISED S PLANS APT CITY RFI 3_COMM23-00099 | REVISED S PLANS APT CITY RFI 3_COMM23-00099.pdf | |
Deferred Submittal_Grill Shade Structure_COMM23-00099 | Deferred Submittal_Grill Shade Structure_COMM23-00099.pdf | |
NOT APPROVED__Deferred Submittal - Floor Trusses 2nd, 3rd, & 4th Floor Area C-D Rev.1__COMM23-00099.pdf | NOT APPROVED_Deferred Submittal - Floor Trusses 2nd, 3rd, _ 4th Floor Area C-D Rev.1_COMM23-00099.pdf | |
APPROVED__Deferred Submittal - Roof Trusses Area A-B Rev.2__COMM23-00099.pdf | APPROVED_Deferred Submittal - Roof Trusses Area A-B Rev.2_COMM23-00099.pdf | |
2ND Deferred Submittal_Floor Trusses 1st, 2nd, 3rd Area C-D Rev.1_COMM23-00099 | Deferred Submittal_Floor Trusses 1st, 2nd, 3rd Area C-D Rev.1_COMM23-00099.pdf | |
APPROVED__Deferred Submittal - Metal Stair 4 Structural Shop Drawings Rev.2__COMM23-00099.pdf | APPROVED_Deferred Submittal - Metal Stair 4 Structural Shop Drawings Rev.2_COMM23-00099.pdf | |
APPROVED__Deferred Submittal - Area A Leave Out Structural Steel Rev.1__COMM23-00099.pdf | APPROVED_Deferred Submittal - Area A Leave Out Structural Steel Rev.1_COMM23-00099.pdf | |
Deferred Submittal_Electronic Safety & Security_COMM23-00099 | Deferred Submittal_Electronic Safety _ Security_COMM23-00099.pdf | |
Deferred Submittal_Stair 4 Structural Steel_COMM23-00099 | Deferred Submittal_Stair 4 Structural Steel_COMM23-00099.pdf | |
Deferred Submittal_Area A Leave Out Structural Steel Rev.2_COMM23-00099 | Deferred Submittal_Area A Leave Out Structural Steel Rev.2_COMM23-00099.pdf | |
Deferred Submittal_Roof Trusses Area A-B Rev 2_COMM23-00099 | Deferred Submittal_Roof Trusses Area A-B Rev 2_COMM23-00099.pdf | |
APPROVED_COMM23-00099_Elec Plans _ Narrative - ASI 01 (A2L Changes _ Area leavouts) (2).pdf | APPROVED_COMM23-00099_Elec Plans _ Narrative - ASI 01 (A2L Changes _ Area leavouts) (2).pdf | |
NOT APPROVED__Deferred Submittal - Roof Trusses Area A-B Rev.1__COMM23-00099.pdf | NOT APPROVED_Deferred Submittal - Roof Trusses Area A-B Rev.1_COMM23-00099.pdf | |
Deferred Submittal_Roof Trusses Area A-B Rev 1_COMM23-00099 | Deferred Submittal_Roof Trusses Area A-B Rev 1_COMM23-00099.pdf | |
APPROVED__Deferred Submittal - Floor Truss Design 2nd, 3rd, & 4rt Floor Area A-B Rev.1__COMM23-00099.pdf | APPROVED_Deferred Submittal - Floor Truss Design 2nd, 3rd, _ 4rt Floor Area A-B Rev.1_COMM23-00099.pdf | |
NOT APPROVED__Deferred Submittal - Metal Stairs 4 Shop Drawings Rev.1__COMM23-00099.pdf | NOT APPROVED_Deferred Submittal - Metal Stairs 4 Shop Drawings Rev.1_COMM23-00099.pdf | |
Deferred Submittal_Floor Truss Design 1st, 2nd, 3rd Area A-B Rev.3_COMM23-00099 | Deferred Submittal_Floor Truss Design 1st, 2nd, 3rd Area A-B Rev.3_COMM23-00099.pdf | |
Deferred Submittal_Metal Stairs - Stair 4 Shop Drawings_COMM23-00099 | Deferred Submittal_Metal Stairs - Stair 4 Shop Drawings_COMM23-00099.pdf | |
APPROVED__Revised A Plans APT City RFI 1 Rev.2__COMM23-00099.pdf | APPROVED_Revised A Plans APT City RFI _1 Rev.2_COMM23-00099.pdf | |
APPROVED__Revised S Plans APT City RFI 1 Rev.3__COMM23-00099.pdf | APPROVED_Revised S Plans APT City RFI _1 Rev.3_COMM23-00099.pdf | |
APPROVED__Revised M Plans APT City RFI 1 Rev.2__COMM23-00099.pdf | APPROVED_Revised M Plans APT City RFI _1 Rev.2_COMM23-00099.pdf | |
COMM23-00099_Struct Plans & Narrative - ASI 01 (A2L Changes & Area leavouts) | COMM23-00099_Struct Plans _ Narrative - ASI 01 (A2L Changes _ Area leavouts).pdf | |
COMM23-00099_Mech Plans & Narrative - ASI 01 (A2L Changes & Area leavouts) | COMM23-00099_Mech Plans _ Narrative - ASI 01 (A2L Changes _ Area leavouts).pdf | |
COMM23-00099_Arch Plans & Narrative - ASI 01 (A2L Changes & Area leavouts) | COMM23-00099_Arch Plans _ Narrative - ASI 01 (A2L Changes _ Area leavouts).pdf | |
APPROVED__Revised S Plans Area A Leave Out Framing Rev.1__COMM23-00099.pdf | APPROVED_Revised S Plans Area A Leave Out Framing Rev.1_COMM23-00099.pdf | |
APPROVED__Revised S Plans APT Landscape Retaining Walls & Fance & Light Pole City RFI 5 Rev.1__COMM23-00099.pdf | APPROVED_Revised S Plans APT Landscape Retaining Walls _ Fance _ Light Pole City RFI _5 Rev.1_COMM23-00099.pdf | |
APPROVED__Revised S Plans APT City RFI 1 Rev.2__COMM23-00099.pdf | APPROVED_Revised S Plans APT City RFI _1 Rev.2_COMM23-00099.pdf | |
Revised S Plans_City RFI 2_Area A Leave Out Framing_COMM23-00099 | Revised S Plans_City RFI 2_Area A Leave Out Framing_COMM23-00099.pdf | |
REVISED S PLANS CITY RFI_COMM23-00099.pdf | REVISED S PLANS CITY RFI 5_DEV24-00008.pdf | |
Revised S Plans APT City RFI 1-Rev.2_COMM23-00099 | Revised S Plans APT City RFI 1-Rev.2_COMM23-00099.pdf | |
APPROVED__Revised P Plans APT City RFI 1 Rev.2__COMM23-00099.pdf | APPROVED_Revised P Plans APT City RFI _1 Rev.2_COMM23-00099.pdf | |
APPROVED__Deferred Submittal - Structural Columns, Beams, Embeds Rev.1__COMM23-00099.pdf | APPROVED_Deferred Submittal - Structural Columns, Beams, Embeds Rev.1_COMM23-00099.pdf | |
APPROVED__Deferred Submittal - Roof Screen Shops and Calcs Rev.1__COMM23-00099.pdf | APPROVED_Deferred Submittal - Roof Screen Shops and Calcs Rev.1_COMM23-00099.pdf | |
RFI P Plans APT City RFI 1 Rev 2 42225 | Revised P Plans - City RFI _1_COMM23-00099_3.pdf | |
Deferred Submittal_Structural Columns, Beams, Embeds IFC_COMM23-00099 | 051200-1.1 Structural Columns, Beams, Embeds IFC.pdf | |
Deferred Submittal_Roof Screen Drawings_COMM23-00099 | 055000-2.1 Roof Screen Rev.1 Shops and Calcs_AEI REVIEWED (KA) (1).pdf | |
Marshall Pointe - Revised P Plans - City RFI 1_COMM23-00099 | Revised P Plans - City RFI _1_COMM23-00099_2.pdf | |
NOT APPROVED__Revised S Plans APT City RFI 1 Rev.1__COMM23-00099.pdf | NOT APPROVED_Revised S Plans APT City RFI _1 Rev.1_COMM23-00099.pdf | |
NOT APPROVED__Revised P Plans APT City RFI 1 Rev.1__COMM23-00099.pdf | NOT APPROVED_Revised P Plans APT City RFI _1 Rev.1_COMM23-00099.pdf | |
NOT APPROVED__Revised M Plans APT City RFI 1 Rev.1__COMM23-00099.pdf | NOT APPROVED_Revised M Plans APT City RFI _1 Rev.1_COMM23-00099.pdf | |
NOT APPROVED__Revised AM Plans APT City RFI 1 Rev.1__COMM23-00099.pdf | NOT APPROVED_Revised AM Plans APT City RFI _1 Rev.1_COMM23-00099.pdf | |
APPROVED_5170 MARSHALL ST_Temp Power.pdf | APPROVED_5170 MARSHALL ST_Temp Power.pdf | |
Revised M Plans APT - City RFI 1_COMM23-00099 | Revised M Plans APT - City RFI 1_COMM23-00099.pdf | |
Narrative of Arch and Mech changes related to ASI 01 | Marshall Pointe Revision Narrative.pdf | |
Modifications to plans regarding upcoming A2L refrigerant changes | COMM23-00099_Plans ASI 01.pdf | |
INCOMPLETE_Revised E Plans - City RFI 1_COMM23-00099 | Revised E Plans - City RFI _1_COMM23-00099.pdf | |
Revised P Plans - City RFI 1_COMM23-00099 | Revised P Plans - City RFI _1_COMM23-00099_1.pdf | |
Revised P Plans - City RFI 1_COMM23-00099 | Revised P Plans - City RFI _1_COMM23-00099.pdf | |
Revised S Plans - City RFI 1_COMM23-00099 | Revised S Plans - City RFI _1_COMM23-00099.pdf | |
NOT REVIWED__Marshall Point - Deferred Submittal Elevator Drawings__COMM23-00099.pdf | NOT REVIWED_Marshall Point - Deferred Submittal Elevator Drawings_COMM23-00099.pdf | |
Please see the attached approved deferred submittal elevator 1 & 2 shop drawings for Arvada reviewapproval. | Marshall_Pointe_R3978_R3979_Elevator Shop Drawings.pdf | |
Please see the attached Marshall Pointe Garage Topping Slab Deferred submittal approved by Wells (Precast engineers), structural EOR, and AOR. | Marshall Pointe_Deferred Submittal_033000-2.2 Garage Topping Slab Rev.2 (IFC)_AEI (KA) (1).pdf | |
NOT APPROVED__Marshall Pointe City-RFI-001 Structural Changes__COM23-00099.pdf | NOT APPROVED_Marshall Pointe City-RFI-001 Structural Changes_COM23-00099.pdf | |
STRUCTURAL COLUMNS, BEAMS | 051200-1 Structural Columns, Beams, Embeds_AEI REVIEW (KA) (1).pdf | |
RFI report MEPF & Structural | Marshall Pointe MEPF _ structural RFI report 3.19.2025.pdf | |
Stamped Temp One-line | E Sheet 10-23-24-125 Marshall Pointe Temp Power - STAMPED.pdf | |
Update electrical to 125amp for units. Includes onelines and associated calculations. | E Sheet Set 2-21-25-22-171 Marshall Pointe Apartments RFI 64 - STAMPED.pdf | |
Temp Power One-Line | E Sheet 10-23-24-125 Marshall Pointe Temp Power.pdf | |
APPROVED__RADON SYSTEM Rev.1.pdf | APPROVED RADON SYSTEM.pdf | |
APPROVED__Radon vertical detail and UL firestop detail Rev.1.pdf | APPROVED Radon vertical detail and UL firestop detail.pdf | |
Radon Submittal comment response - Marshall Pointe Permit COMM23-00099.pdf | Radon Submittal comment response - Marshall Pointe Permit _COMM23-00099.pdf | |
Please see attached Closed RFI report for your review dated 1.21.2025. | Marshall Pointe - Closed RFI Report 1.21.2025.pdf | |
IFC Firestopping.pdf | IFC Firestopping.pdf | |
PTI.pdf | PTI.pdf | |
Reinforced Concrete Special Inspector.pdf | Reinforced Concrete Special Inspector.pdf | |
Structural Masonry.pdf | Structural Masonry.pdf | |
Structural Steel _ Bolting.pdf | Structural Steel _ Bolting.pdf | |
WSIC-(CM-EB)-Resume-Work History-Certs-2023.pdf | WSIC-(CM-EB)-Resume-Work History-Certs-2023.pdf | |
STAMPED SPECIAL INSPECTION FORM | COMM23099_SI Form (1).pdf | |
APPROVED__ARCHITECTURAL PLAN SET Rev.1__COMM23-00099.pdf | APPROVED FULL ARCHITECTURAL PLAN SET COMM23-00099.pdf | |
COMM23099_SI Form.pdf | COMM23099_SI Form.pdf | |
GENERAL CONTRACTOR FORM (NOT AUTHORIZED) | Arvada General Contractor Sign On - COMM23-00099.pdf | |
APPROVED__IECC PERFORMANCE COMPLIANCE PLAN REv.1__COMM23-00099.pdf | APPROVED IECC PERFORMANCE COMPLIANCE PLAN COMM23-00099.pdf | |
APPROVED__STRUCTURAL PLANS Rev.1__COMM23-00099.pdf | APPROVED STRUCTURAL PLANS COMM23-00099.pdf | |
APPROVED__STRUCTURAL CALC Rev.1__CALCS COMM23-00099.pdf | APPROVED STRUCTURAL CALCS COMMS23-00099.pdf | |
APPROVED__ELECTRICAL PLANS Rev.1__COMM23-00099.pdf | APPROVED ELECTRICAL PLANS COMM23-00099.pdf | |
APPROVED__MECH AND PLUMB PLANS Rev.1__COMM23-00099.pdf | APPROVED MECH AND PLUMB PLANS COMM23_00099.pdf | |
Arvada General Contractor Sign On | Arvada General Contractor Sign On.pdf | |
Final Report of Special Inspection working final.docx | Final Report of Special Inspection working final.docx | |
Special Inspections Guidelines working wo interim report final.docx | Special Inspections Guidelines working wo interim report final.docx | |
Statement of Special Inspect final.docx | Statement of Special Inspect final.docx | |
Approved Fabricator working.docx | Approved Fabricator working.docx | |
NOT APPROVED__1ST REVIEW IECC 2018 PLAN.pdf | NOT APPROVED 1ST REVIEW IECC 2018 PLAN.pdf | |